Factory Acceptance Test (FAT) & Site Acceptance Test (SAT) / Commissioning

Analysis
2025-02-02

We successfully executed comprehensive Factory Acceptance Tests (FAT) with International OEMs and Site Acceptance Tests (SAT) on the site with our clients as part of our system delivery and commissioning process. These activities ensured that all fabricated and assembled systems performed reliably, safely, and in full compliance with project specifications before and after deployment. The FAT phase was conducted at our facility, where each system underwent detailed functional testing, calibration verification, and interlock validation under simulated operating conditions. Client representatives were actively involved in witnessing test procedures, reviewing results, and approving readiness for dispatch. Following installation, our commissioning team carried out the SAT, confirming system integrity, field wiring accuracy, communication reliability, and process performance under actual site conditions. All systems were fine-tuned to meet operational targets, and final documentation was submitted to certify full compliance.

Project Images